Re-Roof / Roof-Over
Submission requirements
- Square footage of the re-roof area and type of materials
- Roof-over - Drawings are signed and sealed by a Florida Design Professional -2 copies
- Copy of recorded deed
- Product approval -2 copies
- Installation Sheets, if metal roof 2 copies
|
|